Holiday Inn Express, New Liskeard.

Holiday Inn Express

The elevation

Four colours across one envelope.

Four storeys of guest rooms over a stone-based ground floor, with gabled bays breaking up the run. The finish is stucco: white across the long wing, taupe on the gable bays, terracotta at the end blocks and a blue-grey panel behind the brand sign — with a continuous banded cornice tying the whole thing together.

The colour breaks are what take the time. Each one was set out to land on a gable return or a reveal rather than mid-panel, so the change of colour reads as an edge of the building. The work ran wing by wing off boom lifts, with the banding, window surrounds and cornice returns held to the same line the full length of the elevation, and the entrance kept open throughout.

Project record

PropertyHoliday Inn Express, New Liskeard
Address998029 Hwy 11, New Liskeard, ON P0J 1P0
Building typeHotel

Project team

ClientSunray Group
Architectural designMataj Architects Inc.
Exterior contractorMaple Build LTD

On site

Work in progress, and finished.

The finished building, and the work behind it. Site photography from this job.

Holiday Inn Express, New Liskeard — Entrance and porte-cochère with the lift parked up for the night
Holiday Inn Express, New Liskeard — Basket lowered at the end of a shift, full front elevation behind
Holiday Inn Express, New Liskeard — End block in terracotta beside the taupe gable bay
Holiday Inn Express, New Liskeard — White guest room wing and the blue-grey panel above the patio
Holiday Inn Express, New Liskeard — The long elevation from the lot, colour breaks landing on the returns
Holiday Inn Express, New Liskeard — Gable bay, banded cornice and stone base at the ground floor
Holiday Inn Express, New Liskeard — Patio elevation finished, banding carried around the curve