Stucco and masonry coatings
Elastomeric and high-build acrylic systems over stucco, EIFS, block and concrete, applied at the specified mil thickness rather than by eye.
High-durability coatings for stucco, concrete, masonry and metal, matched to brand standards. Most coating failures are preparation failures, so preparation is a line item, not an assumption.

What we install
Elastomeric and high-build acrylic systems over stucco, EIFS, block and concrete, applied at the specified mil thickness rather than by eye.
Railings, canopies, doors, frames and structural steel prepared and coated with primers and topcoats rated for exterior exposure.
Traffic-exposed concrete, garage soffits, walls and columns, with coatings selected for abrasion and de-icing salt rather than looks alone.
Pressure washing, scraping, crack repair, patching and sealant replacement before any coating goes on. This is where the service life is won.

The assembly
Wash, repair, prime, then coat. Skip any of the first three and the finish will tell on you within two winters, usually at the joints and the south elevation first.
Substrate condition recorded elevation by elevation, colours drawn down on the actual wall and approved in daylight, not off a fan deck.
Pressure washing to remove chalk, dirt and biological growth, then time allowed for the substrate to dry to the coating's moisture limit.
Cracks routed and filled, spalls patched, failed sealant cut out and replaced. Coating over a live crack just moves the failure a season out.
Glazing, signage, landscaping and vehicle areas masked and protected. On occupied hotels we sequence elevations around guest access.
Primer suited to the substrate, then topcoats at the specified spread rate and film build, each elevation finished in a continuous pass to avoid lap marks.
Film thickness spot checked, elevations walked with the owner, touch-ups completed before demobilization rather than after.
Specifying
A thick, flexible film that bridges hairline cracks and moves with the wall. The default on stucco and EIFS elevations that have started to craze.
Exterior Painting on site

Brand-colour coating system across the full elevation.

Repair, prime and repaint on an occupied hotel.

Dark topcoat with contrasting banding and trim.
Before you tender
If your question is not here, call and ask for the estimating desk. We will tell you what an honest scope looks like even if it is not ours to build.
Yes, that is most of our repaint work. We sequence elevations around guest rooms and entrances, keep access clear and work hours that suit the property.
Coatings have minimum application temperatures, typically around 10°C for elastomerics. We plan exterior work between spring and late fall, and will say so rather than push a coat that will fail.
Yes. We draw down samples on the actual wall, check them in daylight, and get written approval before the elevation is coated.
Next step
Elevations, a colour schedule and the substrate type are enough to start. For repaints we walk the building, because the condition of the existing coating sets the scope.