Home/Projects/Fairfield by Marriott, Sault Ste. Marie

Fairfield by Marriott, Sault Ste. Marie.

Fairfield by Marriott

The elevation

Two colours, and every edge between them.

The finished walls are flat stucco fields in two colours above a brick base: cream across the guest room bays, blue-grey pulled forward at the entrance tower and the end returns. It replaces the grey and tan scheme the building wore before. Banding and trim surrounds separate the fields, and the signage gable sits at the centre of the front elevation.

Refinishing that wall on a hotel that stays open means two things before any coating goes on: reach, and masking. The elevation was worked from a boom lift set on the parking edge, and the brick base, window openings and canopy were papered and taped off the full length of each elevation.

Project record

PropertyFairfield by Marriott, Sault Ste. Marie
Address633 Great Northern Rd, Sault Ste. Marie, ON P6B 5A1
Building typeHotel

Project team

ClientSunray Group
Architectural designMataj Architects Inc.
Exterior contractorMaple Build LTD

On site

Work in progress, and finished.

The finished building, and the work behind it. Site photography from this job.

Fairfield by Marriott, Sault Ste. Marie — Finished cream and blue-grey stucco across both wings, seen from above
Fairfield by Marriott, Sault Ste. Marie — Entrance elevation masked off before coating
Fairfield by Marriott, Sault Ste. Marie — Boom lift set on the parking edge to reach the third-floor stucco
Fairfield by Marriott, Sault Ste. Marie — Working the end return one bay at a time
Fairfield by Marriott, Sault Ste. Marie — Masking along the brick base and window heads
Fairfield by Marriott, Sault Ste. Marie — Cutting a colour change from the basket
Fairfield by Marriott, Sault Ste. Marie — Crew at the signage tower on the front corner
Fairfield by Marriott, Sault Ste. Marie — Front elevation with the lift at the gable
Fairfield by Marriott, Sault Ste. Marie — Long elevation part way through

Building one of these?

We can price a similar exterior from your elevations.

Send the drawings and the brand standard. You get a written scope with inclusions and exclusions in about two business days, and we will say plainly which parts are not ours to build.